Transforming community health.
MetroHealth planned a new twelve-story hospital tower, which includes a multi-level connector building to the existing Critical Care Pavilion. The new tower, approximately 270 beds, is located adjacent to the new Central Utility Plant and loading dock. Planned departments include; Med/Surg, NICU, Burn, Labor Delivery Recovery, Anti-Partum, Post-Partum, Pediatrics, Administration, Kitchen, Lobby, Pharmacy, Cardiopulmonary, Interventional Radiology and Imaging, Linear Accelerator, Endoscopy, Neurology, Support Services and other areas typically related to general hospital operations. The new hospital was constructed on the site of the existing South parking garage. Bostwick Design Partnership collaborated with HGA, Design Architect for this project.
